# Guides to building reporting in Canada — BrickFlow

Source: https://brickflow.ca/guides

> Step-by-step guides to Canadian building energy, water and emissions reporting programs, with every requirement linked to the regulator’s own page.

Guides

# Step-by-step guides to building reporting in Canada

What each program asks for, who has to report, and how to file, with every requirement linked to the regulator’s own page.

-   Ontario
    
    ## [How to report Ontario EWRB through Portfolio Manager: a step-by-step guide](https://brickflow.ca/guides/ontario-ewrb)
    
    Who must report under O. Reg. 506/18, what to gather, how to file through ENERGY STAR Portfolio Manager by July 1, and when large buildings need verification.
    
    Facts last checked on October 9, 2026
    
-   Ontario
    
    ## [Whole-building data for Ontario EWRB: how to request it from each utility](https://brickflow.ca/guides/ontario-utility-data-requests)
    
    How to request aggregated whole-building electricity, gas and water data for Ontario EWRB from each utility, with forms, contacts and Green Button links.
    
    Facts last checked on October 9, 2026
    
-   City of Toronto
    
    ## [How to report energy and water use to the City of Toronto: a step-by-step guide](https://brickflow.ca/guides/toronto-energy-water-reporting)
    
    Who must report under Toronto Municipal Code Chapter 367, what is due when, and how to submit through Portfolio Manager, including the 2027 first-time cohort.
    
    Facts last checked on October 9, 2026
    
-   Canada and international
    
    ## [Data verification and assurance for building energy, water and emissions](https://brickflow.ca/guides/data-verification-and-assurance)
    
    What verification and limited or reasonable assurance mean for building energy, water and emissions data, who asks for them in Canada, and how to prepare.
    
    Facts last checked on October 9, 2026
    
-   Canada and international
    
    ## [How to take part in the GRESB Real Estate Assessment: a step-by-step guide](https://brickflow.ca/guides/gresb-real-estate-assessment)
    
    Who takes part in GRESB, what building data the Asset Portal needs, how to submit between April and July, and how external review of your data is scored.
    
    Facts last checked on October 9, 2026
    
-   Quebec
    
    ## [How to file Quebec's large-building energy declaration: a step-by-step guide](https://brickflow.ca/guides/quebec-building-energy-declaration)
    
    Who must declare large-building energy use in Quebec, what to gather for 2025 and 2026, how to file by 30 June 2027, and when a professional must verify it.
    
    Facts last checked on October 9, 2026
    

## Keep every building ready before the deadline

BrickFlow keeps one reviewed record for each building, so the data for each program is complete and traceable when you file.

[Get started](https://app.brickflow.site/) [Contact us](https://brickflow.ca/contact)
