The City of Toronto requires owners of larger buildings to report their energy and water use every year under Toronto Municipal Code Chapter 367, Building Emissions Performance. You report through ENERGY STAR Portfolio Manager, the free online tool the City and the Province of Ontario both use, by sending your building’s data in response to the City’s data request.
This guide is for owners, property managers and consultants who report Toronto buildings. It covers buildings of 50,000 sq ft and larger that already report, and gives a separate section to buildings of 10,000 to 49,999 sq ft that report for the first time in 2027. Every fact below links to the City’s or the Province’s own page, checked on 9 October 2026.
Does it apply to you?
The by-law applies to buildings within the City of Toronto’s current boundaries. The City notes that these properties have postal codes beginning with “M”. The duty to report is set by gross floor area, not by property type; the exemptions below are the exceptions.
| Gross floor area | First year of mandatory reporting | Next deadline |
|---|---|---|
| 4,645 m² (50,000 sq ft) and larger | 2024 | July 2, 2027 (2026 data) |
| 929 to 4,644 m² (10,000 to 49,999 sq ft) | 2027 | July 2, 2027 (2026 data) |
Sources: the City’s reporting page and its deadlines table, which lists July 2, 2027 for buildings of 10,000 sq ft and larger. The by-law sets the deadline as the first business day of July, for data from the previous calendar year.
Who is responsible:
- The property owner is the registered owner on title on December 31 of the year being reported.
- If a property has several owners, all owners are jointly responsible for one report. You can delegate the reporting, but every owner stays responsible if no report is submitted.
- If a property contains more than one building, the by-law requires a separate report for each building.
Condominiums
The City states that, under the current by-law wording, the 2026 size threshold applies to each condominium unit or common area, not to the whole building. A condominium property had to report to the City in 2026 only if that property itself was 4,645 m² or larger. City staff intend to recommend an amendment to close this gap, and the City encourages condominium corporations to report whole-building data voluntarily in the meantime. Condominium buildings of 50,000 sq ft and larger must still report whole-building data to the Province. The City has not yet said how the threshold will apply to condominiums in 2027; check its page before you file.
First-time reporters: buildings of 10,000 to 49,999 sq ft
If your building is 929 to 4,644 m² (10,000 to 49,999 sq ft), your first mandatory report is due July 2, 2027. It covers your building’s monthly energy and water use for the 2026 calendar year, which is already under way, so start collecting bills now.
- The City postponed the first year for this group to 2027 in December 2025. Some older material, including the consolidated by-law text dated May 2024, still shows 2025. The City’s current page is the one to follow.
- The provincial program (EWRB) applies to buildings of 50,000 sq ft and larger. The City describes the EWRB ID as only needed for provincial reporting, so you skip that step.
- Third-party attestation applies only to buildings of 9,290 m² (100,000 sq ft) and larger, so it does not apply to your building.
- What you report, and how, is the same as for larger buildings. The steps below apply to you, except steps 1, 6 and 8.
Exemptions
The City lists full exemptions for buildings that used no energy or water (no application needed), new buildings without an occupancy certificate for the data year, buildings whose whole-building demolition began by year end, and industrial emitters that already reported under O. Reg. 390/18. Partial exemptions cover electricity or natural gas data you cannot obtain, and attestation for large buildings already verified under the provincial program. Apply with the City’s online Exemption Request Form. The by-law requires exemption and extension requests 60 days before the report deadline. Extensions are granted only for events beyond the owner’s reasonable control.
What you need before you start
The by-law lists the information to report in section 367-2.2:
- Descriptive information: property address, primary and secondary property type, total gross floor area, gross floor area of heated and of unheated parking and loading areas, year of construction, number of suites, and the City of Toronto property tax assessment roll number.
- Performance information: electricity (kWh), natural gas (m³), district steam, hot water and cooling (GJ) with the name of the district energy provider, water (m³), any other fuels, and any electricity produced and used on site.
The City asks for monthly data for each month of the previous calendar year. Its page describes where to get it:
- Water: download it from the City’s MyWaterToronto tool, or email [email protected] for aggregated data.
- Electricity: use your electricity utility’s online account, its Portfolio Manager data exchange, or its data request form (Toronto Hydro’s EWRB data request; Toronto Hydro Green Button). The City advises requesting by April 30 and allowing about four weeks.
- Natural gas: use your natural gas utility’s online account or request form (Enbridge Gas EWRB online application; Enbridge Gas Green Button). The City says requests are fulfilled from March 1 to June 1 and take about four weeks.
- Green Button with BrickFlow: for the electricity and gas accounts you hold, BrickFlow brings in your Green Button data for the accounts you authorize, so each month arrives without re-keying bills. For tenant accounts you still need the utility’s whole-building request. Other Toronto-area utilities are listed in our Ontario utility data request table.
Step by step
The City sets out six steps, each with an instructional video on its page. They are shown here as eight actions, one per step, with the shared-meter guidance from the same page split out.
- Get your EWRB ID (50,000 sq ft and larger only). The Ministry of Energy and Mines assigns a six-digit EWRB ID for provincial reporting. Buildings under 50,000 sq ft skip this step.
- Create or log in to your Portfolio Manager account and collect your property data. One account serves every reporting year. Gather the descriptive information listed above.
- Add the property. Enter the address, property type, gross floor area and the other details. If the property has more than one building, the City says to choose “More than One: My property includes multiple buildings” when you set up the profile, and to create a separate profile for each separately metered building.
- Handle shared meters. If buildings share a utility meter, the City describes two options: pro-rate the shared meter’s use using the meter’s cost-sharing agreement, or set up a “parent” profile for the group of buildings that share the meter. Separately metered buildings can also be linked as “child” profiles under a campus.
- Add meters and consumption. Add an energy or water meter for each utility account, then enter monthly consumption for January 1 to December 31 of the data year. Troubleshoot any data entry issues.
- Verify your data (100,000 sq ft and larger). If your building needs attestation this year, have a certified professional verify the data before you submit. See Verification below.
- Report to the City. Open the City’s data request link from its reporting page while logged in to Portfolio Manager, and select and submit your property profiles (for shared meters or a campus, the parent and child profiles). The page currently shows the link for 2025 data, “Report 2025 Data to the City of Toronto”; use the link the City posts for 2026 data when it is available.
- Report to the Province (50,000 sq ft and larger only). Submit a separate response to the provincial EWRB data request, following Ontario’s submission instructions, by July 1.
City and provincial reporting are two separate submissions made with the same tool. The same property data in Portfolio Manager supports both, but sending one does not send the other. In 2026 the Province’s deadline was July 1 and the City’s was July 2.
Checks before you file
- Every meter covers all twelve months of the data year, with no gaps or overlapping bills.
- Gross floor area includes enclosed heated and unheated parking and loading areas, entered as the by-law asks. The City notes that GFA does not include exterior, unroofed or open-air spaces, such as an outdoor parking lot.
- The property tax assessment roll number, year built and number of suites are filled in.
- Each separately metered building has its own report, or the parent and child profiles are set up correctly.
- Units match your bills: kWh for electricity, m³ for natural gas and water, GJ for district energy.
- District heating or cooling providers are named, as the by-law requires.
Verification
Buildings of 9,290 m² (100,000 sq ft) and larger must include an attestation by a certified professional verifying the descriptive and performance information, in the first year the building must report and every fifth year after that. The City accepts, among others, professional engineers, registered architects, Certified Energy Managers, Building Operator Certification holders, Certified Energy Auditors and licensed condominium managers; its page has the full list. The City does not pre-qualify or endorse vendors. If your building has already been verified under the provincial program, you can apply for a partial exemption from the City’s attestation. For how verification differs from assurance and from internal data review, see our guide to data verification and assurance.
After you file
- Keep records. You must keep the information that shows you complied for 6 years from the end of the calendar year it covers.
- Late reports. The City says its reporting link stays open for late submissions.
- Public disclosure. The by-law allows the City to create a public record of the address, property types, floor areas, year built, number of suites and performance information. The City’s Public Disclosure of Report Information Policy (version 1, January 2024) says it will publish aggregated, anonymized or semi-anonymized data, and will not publish data with identifying information such as the street address. Changes to the policy require City Council approval.
- Penalties. Contravening the by-law is an offence with a fine of up to $100,000. Each offence is a continuing offence, with a fine of up to $10,000 for each day or part of a day it continues, and directors or officers who concur in a corporation’s contravention can also be fined. Knowingly submitting false or misleading information is also an offence.
Common mistakes
- Filing with the Province and assuming the City is covered. They are two submissions with two deadlines.
- Using last year’s data request link. The City has published a separate link for each data year.
- Waiting for 2027 to start collecting 2026 data. First-time reporters need every month of 2026, and utility requests take weeks.
- One report for several buildings. Each building on a property needs its own report unless the buildings share meters and are set up as a parent or campus.
- Missing the exemption window. Requests are due 60 days before the deadline, not on deadline day.
- Forgetting the attestation year. For 100,000 sq ft and larger buildings, it applies in the first year and every fifth year after.
- Following outdated dates. Older material shows 2025 or 2026 as the first year for smaller buildings; the City’s page says 2027.
How BrickFlow helps
BrickFlow keeps one reviewed record per building, built from Green Button data and the bills and files you provide, so the monthly figures, floor areas and meter details the City asks for are in one place and checked against their sources. When it is time to file, the same record feeds Portfolio Manager for both the City and the Province.
Sources
- City of Toronto: Energy and water reporting for buildings
- Toronto Municipal Code Chapter 367, Building Emissions Performance
- Ontario: Report energy and water use for large buildings
- Ontario: Guide to energy and water reporting, submit your report
- City of Toronto: Building Emissions Performance, Public Disclosure of Report Information Policy
This guide is for orientation only and is not legal advice. Requirements depend on each building’s size, type and location, and programs change: confirm the details on the regulator’s own pages before you file.